Production and delivery of ribbed pipe supports
Production and delivery of ribbed pipe supports RIBBED PIPE SUPPORTS 1.4404 RIBBED PIPE SUPPORTS ST.45.8 SSL 5A2-1 RIBBED PIPE SUPPORTS ST.45.8 15X250X36
Delivery of boiler evaporator parts for The Unit 7
Delivery of boiler evaporator parts for The Unit 7
Disassemble and assemble of steam pipelines
Reconstruction of the boiler in The Unit 6 – TPP Tuzla Replacement of the main pipeline for fresh steam, including the installation of hanging brackets, drainage, venting and impulse lines up to the first partition valve Replacement of intake reducing stations RS-1 and RS-2 and equipment for RS-3 Replacement of flowmeters in the main […]
Overhaul of the facility M&TPP Ugljevik
Overhaul in 2023 – from May 16th until June 23rd 2023. Replacement of part of the piping system of the combustion chamber Overhaul of coal powder channel and burner Overhaul of the mill plant Mechanical maintenance of boiler equipment during overhaul Construction of pipe bypasses Replacement of the damaged part of the steam pipe system […]
Production and assembly of the DCB column
Production and assembly of the DCB column Procurement of materials Production of a mixer Production of the DCB column Production of the interior part of the column Production of Steel construction Anti-corrosive protection and assembly
Installation of mechanical equipment for the transportation system
Installation of mechanical equipment for the transportation system Placing the pontoon platform on the route Installation of leading and returning rolls on pontoons Installation of tension and operating drums Installation of the upper and lower line routers Installation of line scratchers and wipers Installation of line units and hoppers Installation of the hood Pulling in […]
Overhaul of the Clean petroleum fuel terminal
Total overhaul of the Clean petroleum fuel terminal Blažuj Mechanical works: Uninstallation and installation of pipelines, reinforcement, shaped pieces and support pieces Installation of metal sheets for a double floor, dome roof, floating roof, aluminum dome roof, connections, measuring strips for tanks T1, T2, T3, T4, T5 and T6 Procurement and installation of equipment (pumps, […]
Construction of a gas boiler room
Construction of a gas boiler room Construction and commissioning of a gas boiler room, as well as a platform with trailers, and installation of Compressed natural gas unit within The Oil Refinery Modrica Delivery of a hot water gas boiler, with safety fittings, and a burner with a high-pressure gas ramp Delivery and installation […]
Construction of inside infrastructure for compressing and preparation for shipping of natural gas
Construction of inside infrastructure for compressing and preparation for shipping of natural gas Installation of a gas dryer in a container unit Installation of the 180K-101A/B/C compressor in a container unit Compiling and installation of the entry block for measuring the quality and quantity of gas Installation of gas batteries in a container unit […]
Construction of a gas boiler room with two boilers of 10 MW each
Construction of a gas boiler room with two boilers of 10 MW each Dismantling of existing equipment Procurement, delivery and installation of the mechanical part of the equipment Procurement, delivery and installation of electrical equipment in the boiler room Procurement, delivery and construction works in the boiler room Reconstruction of the fuel oil station