Rekonstrukcija Terminala tečnih naftnih goriva Bihać
Izvođenje radova na rekonstrukciji kotla na bloku 6 – TE Tuzla Zamjena glavnog parovoda svježe pare, uključujući montažu zavješenja, drenažnih, odzračnih i impulsnih linija do prvog pregradnog ventila Zamjena upusnih reducir stanica RS-1 i RS-2 i opreme za RS-3 Zamjena protokomjera u glavnim i priključnim vodovima svježe pare
Revitalizacija kotlovskog postrojenja bloka 7-230 MW
Izvođenje radova na rekonstrukciji kotla na bloku 6 – TE Tuzla Zamjena glavnog parovoda svježe pare, uključujući montažu zavješenja, drenažnih, odzračnih i impulsnih linija do prvog pregradnog ventila Zamjena upusnih reducir stanica RS-1 i RS-2 i opreme za RS-3 Zamjena protokomjera u glavnim i priključnim vodovima svježe pare
CO2 Scrubber gas collector
Production and delivery of parts for the CO2 Scrubber gas collector
Replacement of the electrostatic precipitator filter with a hybrid filter
Replacement of the electrostatic precipitator filter with a hybrid filter Mechanical and installation of insulation, as well as cladding during the installation of the new hybrid filter, which consists of one section of electrostatic precipitator (ESP), eight sections of bag filters (FF) (roof boxes), compressed air system, lime injection, dust recycling system, bypass filter and […]
Replacement of condenser tube TYPE 300-KCS-4
Capital overhaul – engine room of the main object of the Thermal Power Plant Works on the replacement of condenser tube TYPE 300-KCS-4
Replacement of a new inlet hood, inlet pipeline system with compensator and thermal insulation
Agglomeration – AMZ Replacement of a new inlet hood, inlet pipeline with compensator and thermal insulation, rehabilitation of the outlet hood, replacement of the outlet pipeline, rehabilitation of the air tunnel above the bypass and collecting baskets on HF 5.
Installation of the boiler drum in The Unit 7
Installation of the boiler drum in The Unit 7 Dismantling service of the old and installation of the new boiler drum in The Unit 7 Functionality, testing and thermal imaging analysis
Installation of hot pipeline gas boiler with following equipment and burner
Delivery and installation of hot pipeline gas boiler with following equipment and burner Delivery of Viessmann gas boiler 1600 KW, with following equipment, and Weishaupt burner WM – G20/4-A Delivery and installation of a two-layer stainless steel funnel with thermal insulation between the stainless steel layers Construction of a gas boiler house and platform with […]
Installation of the steam pipe of the intermediate superheated steam of the boiler unit 7
Installation and supervision of the installation of the steam pipeline of the intermediate superheated steam of the boiler Unit 7
Procurement and installation of high-pressure heater (HPH) 1 in Unit 7
Procurement and installation of high-pressure heater 1 in Unit 7 High-pressure heater 1 for Unit 7 Service and completing of the existing one, as well as the installation and commissioning of the new HPH 1