Construction of inside infrastructure for compressing and preparation for shipping of natural gas
Industry
Refinery and Petrochemicals
Year
2021
Duration
166 days
The value of the project
480.000
Customer/Client
Oil Refinery Brod
Description
Construction of inside infrastructure for compressing and preparation for shipping of natural gas
- Installation of a gas dryer in a container unit
- Installation of the 180K-101A/B/C compressor in a container unit
- Compiling and installation of the entry block for measuring the quality and quantity of gas
- Installation of gas batteries in a container unit
- Installation of automatic machines with KPG drive 180X-104, mobile stations 180X-105, drainage trays 180V-104
- Delivery and installation of an odorization unit, a shower in case of an accident
- Production and installation of pipelines from 2" to 8" group, with supports
- Examination of welded joints without damaging the material